Meeting start time: 3:00 pm
Members/Grad Students/Mentors Present: Eli, James, Mathew, Sage
- Began assembly the initial nitrogen experiment
- Brazed together VCR fittings with SS tubing
- Assembled cross for various measurements to be attached to the nitrogen dewar
- Sealed 3 thermocouples to a pass-through plug using a two-part epoxy (J-B Weld)
- Installed nitrogen gas bottle into storage container for safe experimentation
- Face VCR fitting for VT.