Meeting start time: 3:00 pm

Members/Grad Students/Mentors Present: Eli, James, Mathew, Sage

  • Began assembly the initial nitrogen experiment
  1. Brazed together VCR fittings with SS tubing
  2. Assembled cross for various measurements to be attached to the nitrogen dewar
  3. Sealed 3 thermocouples to a pass-through plug using a two-part epoxy (J-B Weld)
  4. Installed nitrogen gas bottle into storage container for safe experimentation
  5. Face VCR fitting for VT.