Wild Horse Wind and Solar Facility officially opens for tours in April and closes Nov. 15th. The presentation and tour combination takes 1.5 to 2 hours depending on the group. The presentation takes place in a classroom at the Renewable Energy Center and covers PSE’s wind assets, wind and solar technology, components, challenges, economics, and construction. After covering the basics, an outside walking tour visits the smaller 52 kw solar array, generator, transformer, blade, and a look inside of the base of an active wind turbine.

All tour participants must go over the guidelines and sign a liability form, which can be turned in upon arrival. We also have directions to the facility. You can also visit www.pse.com/wildhorse for these documents and more about the Wild Horse Wind Facility.

Please keep this in mind, and we will discuss a trip at a future meeting!

 

Image via Wild Horse Renewable Energy Center on Facebook